Mattar Residences Project Info
Mattar Residences is a freehold condo of 26 residential units in one 5-storey block at 7 Mattar Road (S)387716, in District 14, in the Geylang planning area. The car park has 21 lots, 1 handicap lot and 7 bicycle lots, and the block has 2 lifts.
The site is 1,332.4 sqm (14,341 sqft) on Lots 06143P, 06144T, 06146K, 08315N and 08316X of Mukim 24 at Mattar Road, and the plot ratio is 1.4.
Mattar Residences was developed by L.K. Ang Construction, which is itself the developer of record, with no separate project company. The Expected TOP is 30 September 2023 and the Expected Legal Completion is 30 September 2026.
| Project Name: | Mattar Residences |
|---|---|
| District: | 14 |
| Developer: | L.K. Ang Construction Pte Ltd |
| Address: | 7 Mattar Road (S)387716 |
| Tenure: | Freehold |
| Site Area: | 1,332.4 sqm / 14,341 sqft |
| Type of Development: | Private Condominium |
| No. Of Units: | 26 residential units |
| No. of Blocks/Storeys: | 1 Block of 5-Storey Residential Development |
| No. Of Carparks: | 21 carpark lots, 1 handicap lot and 7 bicycle lots |
| Plot Ratio: | 1.4 |
| Architect: | AGA Architects Private Limited |
| M&E: | Elead Associates Pte. Ltd. |
| C&S: | LCH Geoeng Pte. Ltd. |
| Main Contractor: | Guan Xing Pte. Ltd. |
| Facilities: | Gymnasium, Social Deck with Barbecue Pit, Rinse Off Shower, Pool Deck, Relaxing Pool, Play Area |
| Developer Licence: | C1384 |
| Expected Date of TOP: | 30 Sep 2023 |
| Expected Date of Legal Completion: | 30 Sep 2026 |
Mattar Residences Location Map

Click to open streetdirectory.com map in new window
The nearest station to Mattar Residences is Mattar MRT Station (DT25) on the Downtown Line. MacPherson MRT Station (DT26 and CC10), an interchange of the Downtown Line and the Circle Line, and Aljunied MRT Station (EW9) are the other stations in the area. Aljunied Park is a 6-minute walk away, and Paya Lebar Quarter, Paya Lebar Square and SingPost Centre are an 8-minute drive away.
Mattar Residences Facilities on the Lower Roof Level
The facilities of Mattar Residences are on the lower roof level: the Gymnasium, the Social Deck with Barbecue Pit, the Rinse Off Shower, the Pool Deck, the Relaxing Pool and the Play Area. The level also holds the lift lobby, the stairwell and the generator set.
Other facilities: an electrical switch room, a generator at roof level, a bin point, an accessible toilet and the bicycle parking lots.
Access and security: an audio intercom links the 1st storey lift lobbies and the units where applicable, a motorised gate system is at the main entrance, proximity card access is at the 1st storey lift lobby, the side gate and the gym, and CCTV covers designated common areas.
Mattar Residences Fittings Are the Same in All 8 Unit Types
The specification is the same for all 8 unit types. The differences are a sliding door to the kitchen in types B2, C1 and D1, a utility room with a bi-fold door in type D1, and the taller ceilings of the first-storey unit.
Kitchen: a solid surface countertop with high and low level laminate or melamine cabinets, a stainless steel sink with mixer, a hood, an induction hob and a built-in oven. The hood, hob and oven are by Techno, and the fridge is by Midea or EuropAce.
Bathrooms: each bathroom has a vanity top with one basin and basin mixer, a shower compartment with shower mixer set, a mirror, a water closet, a towel rail or robe hook and a toilet paper holder. The sanitary ware is by American Standard and the taps and fittings are by BRAVAT. Electric storage hot water serves all bathrooms.
Floors and walls: the living, dining, kitchen, study and utility areas have porcelain tile with skirting, the bedrooms have timber flooring with skirting, and the bathrooms and balcony have porcelain tiles. The walls of the living, dining, bedroom, study, hallway and balcony areas are skim coat or plaster with emulsion paint, the bathroom walls are porcelain tile to the designated surface, and the kitchen walls are porcelain or ceramic tile or skim coat with emulsion paint.
Windows: the windows are aluminium-framed casement, top hung or fixed windows with powder-coated frames and glass of at least 6 mm. The casement windows have Crystal Grey Reflective Glass and are tinted, and every unit has window restrictors.
Doors, wardrobes and air conditioning: the main entrance has a fire-rated timber door, the bedrooms and bathrooms have timber doors, and the balcony has an aluminium-framed glass sliding door. The bedrooms have built-in wardrobes with a laminate or melamine finish. Daikin split unit air conditioning with R32 refrigerant serves the living, dining, study and bedrooms.
Ceiling heights: on storeys 2 to 5 the living, dining, bedroom and study areas are 3,225 mm clear, the kitchen and bathrooms 2,550 mm and the balcony 3,200 mm. In the first-storey unit, #01-01, the living, dining and bedroom areas are 4,475 mm, the kitchen and bathrooms 2,550 mm and the balcony 4,450 mm. All heights are approximate.
Balconies: the balconies have drainage and no power socket, and only the first-storey PES unit has a water supply.
CONQUAS Band 3 in 2024
Mattar Residences received CONQUAS Band 3 in 2024. The band is a firm-level record over a rolling six-year window, not a project score.
Mattar Residences Unit Distribution Chart: 7 Stacks Over 5 Storeys

Click Here for Enlarged Mattar Residences Unit Distribution Chart
There are 7 stacks, 01 to 07, on storeys 1 to 5, and 26 homes: 7 on storey 2, 6 on each of storeys 3 to 5 and 1 on storey 1. A unit number reads #storey-stack, so #03-03 is the storey 3 home in stack 03.
Stack 01 is type A2 on storeys 2 to 5 and type C1-P on storey 1, stack 02 is type B1, stack 03 is type B3 on storey 2 and type D1 on storeys 3 to 5, stack 04 is type A3 on storey 2 only, stack 05 is type B2, stack 06 is type C1 and stack 07 is type A1.
This is not a printing fault: stack 04 has one home, and stacks 01 and 03 change type partway up.